FOI #26-111 (02-20-26, 12:21 pm)

UConn Residential Housing

Name: Student Student

Affiliation: Daily Campus

Location: UConn Storrs

Request Date Start: 08/01/2023

Request Date End: 02/20/2026

Details: - All information regarding renovations to all residential housing buildings at the UConn Storrs campus
- Documentation on water damage to residential buildings that have flooded over the past three academic years (2023-2026), including Werth Tower, McMahon, Belden Hall in Alumni, Goodyear in Northwest
- Information on the cost to repair the buildings damaged by flooding
- Documentation on the water pipes installed in all residential buildings on the Storrs campus
- Building plans to all UConn Storrs residential buildings that include plumbing information

Notes: