FOI #25-557

Boiler Plant Equipment & Tunnel Connection Project

Name: Mark Zurada

Affiliation: Withheld.

Location: UConn Storrs

Request Date Start: Withheld.

Request Date End: Withheld.

Details: Please send the final and compiled bid tabulation (bid tally), including all quantities and unit pricing for each bidder, for 'Boiler Plant Equipment & Tunnel Connection Project' that was submitted on 01/26/2021. I believe the project number is '300151-2', but I could be mistaken. If so, please use the project name and date to lookup the responsive documents. We specifically request the line-item bid tabulation showing each material, quantity, unit, and unit price for every bidder. If no such line-item tally was created, please provide the full bid submissions from each contractor. A grand total sheet alone is not sufficient to satisfy this request unless it was a lump sum bid.

Notes:


This entry was tagged .