Certified Payroll
Name: Hope Redding
Affiliation: Withheld.
Location: UConn Storrs
Request Date Start: Withheld.
Request Date End: Withheld.
Details: • Ferguson Electric PHASE 1 for Wk ending 10.1.22 through to the present
• Ferguson Electric PHASE 2 for Wk ending 10.1.22 through to the present
• So. New England Electrical Testing for Wk ending 10.2.22 through to the present
• Ferguson Mechanic PHASE 1 for Wk ending 10.1.22 through to the present
• Ferguson Mechanic PHASE 2 PLMB for Wk ending 10.1.22 through to the present
• Ferguson Mechanic PHASE 2 HVAC for Wk ending 10.1.22 through to the present
• Scholar Painting PHASE 1 for Wk ending 10.1.22 through to the present
• Scholar Painting PHASE 2 for Wk ending 10.1.22 through to the present
Notes: