University Athletic District Development Phase 2 - Project No. 201696 (Internal Case #19-17)
Name: Hope Redding
Affiliation: Withheld.
Location: UConn Storrs
Request Date Start: Withheld.
Request Date End: Withheld.
Details: We are requesting additional certified payroll records submitted by the contractors listed below for work performed on the University Athletic District Development project, phase 2 project referenced above. I've attached an update FOIA letter for your records.
• Ayotte & King for Tile for Wk ending 3.28.20 through to the present
• C & C Mechanical (sub to P & D) for Wk ending 3.28.20 through to the present
• Capozzoli Water Mgnt (sub to P & D) for Wk ending 3.8.20 through to the present
• Columbia Sheet Metal (sub to Ferguson Mechanical) for Wk ending 3.22.20 through to the present
• Eastern Steel Erectors (sub to Schenectady) for Wk ending 3.28.20 through to the present
• Haven Steel Erectors (sub to Shepard Steel) for Wk ending 3.28.20 through to the present
• HHS Mechanical for Wk ending 3.28.20 through to the present
• MT Ford Industries for Wk ending 3.28.20 through to the present
• O&A Insulation (sub to Ferguson Mechanical) for Wk ending 3.28.20 through to the present
• P & D Mechanical for Wk ending 3.29.20 through to the present
• Stairs & Steel (sub to Shepard Steel) for Wk ending 3.28.20 through to the present
• Wayne J. Griffin Electric for Wk ending 3.29.20 through to the present