Certified Payroll
Name: Hope Redding
Affiliation: Withheld.
Location: UConn Storrs
Request Date Start: Withheld.
Request Date End: Withheld.
Details: We are requesting certified payroll records submitted by the contractors listed below for work performed on the UCONN Gant Building project. I’ve attached an FOIA letter for your records. We can continue accepting the responsive records electronically. If you have questions or have trouble opening the attachment, please let me know.
• Environmental Testing & Balancing PHASE 1 for Wk ending 11.28.21 through to the present
• Environmental Testing & Balancing PHASE 2 for Wk ending 11.28.21 through to the present
• Ferguson Electric PHASE 1 for Wk ending 2.5.22 through to the present
• Ferguson Electric PHASE 2 for Wk ending 1.22.22 through to the present
• Ferguson Mechanic PHASE 1 for Wk ending 2.5.22 through to the present
• Ferguson Mechanic PHASE 2 PLMB for Wk ending 1.22.22 through to the present
• Ferguson Mechanic PHASE 2 HVAC for Wk ending 2.5.22 through to the present
• Scholar Painting PHASE 1 for Wk ending 2.5.22 through to the present
• Scholar Painting PHASE 2 for Wk ending 1.28.22 through to the present
• Sign Pro PHASE 2 for Wk ending 2.5.22 through to the present
Notes: